The FIDES guide 2009 (Edition A) proposes a methodology for the reliability assessment of electronic to evaluate and control product reliability progress throughout life cycle. The reliability control approach considers rounds of results evaluation to identify and implement activities to improve reliability.
Considering the product development phases according to DO-254, this work recommends four rounds of reliability assessment, during the PDR (Preliminary Design Review), CDR (Critical Design Review), SoF (Safety of Flight Review) and EIS (Entrance into Service). For these phase gates, a new approach for the process factor (ПProcess_Phase) is proposed based on a new equation, reduced number of recommendations (audit questions) and considering the effects and risks of the “lead-free transition” through incorporating and updating the 'lead-free process factor' (ПLF).
The FIDES methodology was updated in 2010, at this time the effects of lead-free could not be incorporated in the reliability models, and, in the initial phases of this transition, the industry had relatively little experience with lead-free soldering. Therefore, the basic failure rate (λ0) values, the component manufacturing process factor (ПPM), and the process factor (ПProcess) did not change, however, FIDES has introduced the 'lead-free process factor' (ПLF) to consider the variation of the risk of product failure related to modifications applied to the design and manufacturing processes. The current lead-free process (ПLF) considers 21 audit questions, and the current process factor (ПProcess) considers 155 recommendations; these questionnaires may be a very time-consuming activity during product development phases and very difficult if answering it without perform the audits.
The new approach for the process factor (ПProcess_Phase) can be applied with more agility because it considers a modified equation and ‘Process Grade’ that gather, in a simpler and update manner, a reduced number of recommendations for the ПProcessand ПLF. Furthermore, the new process factor (ПProcess_Phase) will respect the ranges of current ПProcess and ПLF (1 to 8 and 1 to 2, respectively). The agility of the new process factor approach makes it possible to perform the reliability assessment in four rounds during the product development.
Key Words: Failure rate, FIDES, lead-free, Pb-free, pi-factors, Process Factor, reliability evaluation
Author(s)
Murilo Levy Casotti, José Carlos Boareto, Orestes Estevam Alarcon, Andre Oliveira